First of all we want to apologies to everyone because the lateness of this video posting. We have encountered some difficulties through the progress of uploading this video. So, please enjoy this video and any comment will be welcome!

Mar
31

This is our proposal for our robotic project. Please feel welcome to leave comment. Thank you.

__________________________________________________

Project Programmer: Mohd Azim Faiz bin Mohd Yussof (N6089909)

Robot Designer: Mohd Afiqi bin Jamaludin (N6090362)

Secretary and Documentation: Nurhanum Akmal binti Ahmad (N6089763)

Themes: Environment

Name of the Project: Water Filling Robot

Water Filling Robot is a robot which can fill in the water in the pail without need human to construct it. The robot will automatically detect the pail, open the pipe and fill in the water in the pail. When the water nearly to full, the robot will close the pipe and stop the water flow.

Objectives:

  • Water Filling Robot is design to help people especially housewife to make sure that water in the pail at the bathroom always in the full level.
  • People do not need to wait for the pail to get full because the robot will automatically stop the water flow when the pail is already full.

Problem Statement:

  • Nowadays, people busy with their work. Even at home, there lot of work to do especially for those who already has family.
  • Water waste always happen in the bathroom because no other machine can control and can tell people when the water is in full level.
  • With the theme environment, we will design robot that can helps people to fill water in pail without having problems such as water wasting and no water in the pail when the owner wants to use it.
  • The owner also does not need to wait at the bathroom to keep watching the water.
  • Besides, they can do other works while the water is being filling.
Mar
30

For the final day before presentation, we have completed almost 95% of robot progress. Actually the robot progress already finish a few days before. However due to some problem happen to our water pipe and motor, we have to change the design as fast as we can. Below is our tools that will be use in our group presentation:

dscn8445

This bucket with water pipe is actually replacing the real water pipe. We decided to bought this bucket because two reasons. First, there is no real water pipe in the presentation room and second, using this pipe we can easily control the water flow and avoid water from overflow.

dscn8444

This is the rubber pipe that connect from pipe of bucket to the robot. This rubber pipe will flow the water from bucket to robot and next to the small bucket.

dscn8443

This is small bucket that wrap with red paper. The original color for this small bucket is actually blue. We have to wrap it with red paper because the light sensor on our robot will detect red colour first before stop moving. This small bucket function is collecting the water that flow from main bucket.

Since we have already updated the final progress of our robot in the previous post, so there is no more progress we can show for now. But for the next post we will upload the video of our robot. Thank you for viewing our blog. Any comment will be welcome to improve this site. Our report for this final week will be put below:

__________________________________________________

DATE: 11 March 2009

TIME: 0800 – 1330

TOPIC: Robot Finalizing

AIM:

The aim of this week is to finalize the design and make sure no more problem will occur.

OBJECTIVES:

By the end of the lesson, our group should be able to:

1. Finish the design of the robot.

2.  Make sure no more problem will occur during and after presentation.

3. Finish with any modification on the robot and other equipment.

MATERIALS AND EQUIPMENT REQUIRED:

1.  (9797) LEGO MINDSTORMS Education Base Set

2.  (2000080) LEGO MINDSTORMS Education NXT Software v2.0

3.  Bucket with pipe

4.  Small bucket

5.  Rubber pipe

EXPLANATION ON THIS WEEK PROGRESS:

1.  In this week, our group manages to finish designing the robot.

2.  We managed to finish the modification on the robot and other equipment.

3.  The programming have been improve since the last time we find small problem occur.

Mar
30

As the week progress, our robot finally reach the final stage of improving and editing. We finally have come out with the most suitable design where every aspect of maximizing robot effeciency been deeply analyze.

We have separate our design into 3 separate parts. The first part is the lower body part that support whole design. The previous design was not really suitable as the width does not wide enough to support the upper part since the upper part must high to reach bucket. So we added the width with gap between left and right tyre become wider and between back and front longer.

dsc00041aaa

Bottom view

dsc00042aaa

Bottom + behind view

dsc00044aaa

Top + behind view

Next is the upper part. Like mention above, we have design this second part to be high enough in order to reach the bucket.

dsc00045aaa

dsc00053aaa

This part is placed above lower part and join together. We have design this part to be slant forward in order to make sure the water that flow through the rubber pipe can enter the bucket.

dsc00052aaa

Notice that we have placed the NXT behind of the model. The purpose is to support the whole weight of model since the upper part is slant forward. So in other word this NXT positioning will balance the weight of behind and front model.

Beside that, we also placed the NXT upright position because the upper part need support to avoid it from collapse. The NXT and upper part were joined together using component parts at left and right side, as shown on the picture.

dsc00054aaa

The third part of this model is the motor that open and control water flow. This motor will open and close the pipe connection according to programming instruction. We have design the motor in simple design as it did not move and placed on the pipe.

dsc00122aaa

So, the complete design of our model is the combination of all three parts which are lower part, upper part and controller motor. The picture was shown below:

dsc00059aaa

dsc00064aaa

That is all for now. Any other news or improvement will be inform in the nearest time. We are welcoming you to comment on our robot design. For viewing our report, you can see below:

__________________________________________________

DATE: 4th March 2009

TIME: 0800 – 1330

TOPIC: Robotics Project Progress

AIM:

The aim of this week lesson is to design a Water Filling Robot and the robot able to function well.

OBJECTIVES:

By the end of the lesson, our group should be able to:

1. Finalize the design of Water Filling Robot.

2.  Demonstrate a robot which can detect when the water is nearly full.

3.  Demonstrate a robot which can detect the water pipe.

4.  Programming the robot using LEGO MINDSTORMS NXT Software.

MATERIALS AND EQUIPMENT REQUIRED:

1.  (9797) LEGO MINDSTORMS Education Base Set

2.  (2000080) LEGO MINDSTORMS Education NXT Software v2.0

3.  Water pipe

4.  Rubber pipe

4.  Water

EXPLANATION ON THIS WEEK PROGRESS:

1.  In this week, our group manages to finish designing the robot.

2.  Besides that, our programming is also completed.

3.  We manage to show to our lecturer on how our robot functions.

4.  Our lecturer satisfied and approves our project and we are ready to present it next week.

Mar
30

As the week progressing, we have already think about about robot design which will be present at the end of semester. After a lot of suggestion and consideration, we finally come out with the first draft of our robot. As it function is to filling the bucket with water and close the water pipe when the owner busy doing other work, this robot is named Water Filling Robot.

The improvement of our robot is still in progress. However from what we have done this week, it seems like it still need some modification on it body frame and design. We have take some pictures for you to see:

__________________________________________________

dsc01292

dsc01293

dsc01294

dsc01295

dsc01301

dsc01304

dsc01303

dsc01302

Still, our robot also need more improvement on sensor and motor position. Thanks for viewing our blog. Any comment will be appreciate. For this week report, please see below:

__________________________________________________

DATE: 25th February 2009

TIME: 0800 – 1330

TOPIC: Robotics Project Progress

AIM:

The aim of this project is to start designing the robot for the assessment 2 requirements.

OBJECTIVES:

By the end of the lesson, students should be able to:

1. Design a robot for their group project.

MATERIALS AND EQUIPMENT REQUIRED:

1.  (9797) LEGO MINDSTORMS Education Base Set

2.  (2000080) LEGO MINDSTORMS Education NXT Software v2.0

PROCEDURES:

1.  In this week, we have decided to make the Water Filling Robot which the robot can fill the water in the bucket.

2.  After doing some sketching for the robot and being approved by our lecturer, we are started to design the robot.

3.  In this week, we just manage to design the robot while the programming still in progress.